Pump Rental Sales Playbook
Nathan, we’ll build your new rep’s first 100 accounts in 10 days. The first 25 are below, and they’re yours either way.
If your Inside Sales Representative seat stays open another quarter, ignore this. If it doesn’t, the next two minutes are worth it.
What we noticed
Your rental customers choose a company on the day the trench is open. A rep who already knows which jobs start this month is the one they call first.
Your posting asks the rep to generate leads for Outside Sales on top of the counter and dispatch work. The list is the part that can be finished before they sit down.
What changes for your new AE
Your new rep starts day one with 100 accounts you approved, each with the project and the reason to call now, and a first note written to the top five, instead of spending the first weeks searching for jobs. Your Outside Sales team gets leads that are already qualified.
- 28% of a rep’s time goes to selling Source: Salesforce, State of Sales (7,700+ sellers, 2022)
- 3.0 months average ramp for a new SDR Source: Bridge Group, 2025 SDR report (351 companies)
- 60% of SDRs hit quota Source: Bridge Group, 2025 SDR report (351 companies)
- 1.9 years average SDR tenure Source: Bridge Group, 2025 SDR report (351 companies)
Your first 25 accounts
Picked from how your posting and your site describe your markets. Each one has the reason it’s here and the source.
- South Brazos Street utility work San Antonio, TX · Alazan Creek to Apache Creek1
A creek-side utility job in San Antonio with a named contractor starting now is where trench dewatering and sewer bypass get rented first.
Buyer: Project superintendent at Elecnor BelcoWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- City of San Antonio: Peggy Drive Area Drainage San Antonio, TX · Eastgate Subdivision, $20 million bond allocation2
A channel regrade and storm drain that runs through winter 2028 needs pumps for as long as the trench is open, and the first pump rental after a job starts usually sticks.
Buyer: City project manager or the awarded contractorWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- SAWS: Wild Springs sewer main replacement San Antonio, TX · $750,000 estimate, 60 days3
A sewer main replacement that bid last month starts soon, and sewer bypass is what this job is.
Buyer: Bid winner's superintendentWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Zachry Construction San Antonio, TX · Roadway and bridge package4
A roadway and bridge package that began this fall will have drainage and excavation to keep dry for two years.
Buyer: Project manager or equipment managerWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Toyota Motor Manufacturing Texas San Antonio, TX · $3.6 billion expansion, 2,000 jobs5
A plant doubling in size needs site work, fire suppression water and process fluid handling for years, but a company this size already has vendors.
Buyer: Facilities or maintenance leadWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Arca Continental Coca-Cola Southwest Beverages San Antonio, TX · $42 million, 170,000 sq. ft. expansion6
A bottler adding a line has washdown, liquid transfer and wastewater to move, which are on your food and beverage list.
Buyer: Plant or maintenance managerWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- H-E-B San Antonio, TX · $125 million bakery7
Two years of building on the East Side means site dewatering and washdown water for the general contractor, then process fluid for the plant.
Buyer: Construction project leadWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- SAWS: 2026 annual water distribution leak repairs San Antonio, TX · Work-order contract, package 18
Leak repairs are emergency dewatering over and over, which makes the contractor a repeat renter if CPE is the number they call.
Buyer: Awarded contractor's operations leadWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- IEM San Antonio, TX · 1 million sq. ft. plant at Brooks, 3,000 jobs9
A million-square-foot plant in San Antonio is early enough that no pump vendor has been chosen for its site work.
Buyer: Construction or facilities leadWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Harris County Flood Control District: Blue Bell basin Houston, TX · Stormwater detention basin10
A detention basin is an excavation that has to stay dry, and Houston is a drive from the San Antonio branch.
Buyer: Awarded contractor's project managerWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Harris County Flood Control District: Genoa Red Bluff basins Houston, TX · Stormwater detention basins, phase 211
The same owner as the basin above, so one contractor relationship can cover two Houston jobs.
Buyer: Awarded contractor's project managerWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Econ Group Houston, TX · $13.3 million contract12
A contractor with a $13.3 million channel job already awarded is the buyer who needs dewatering this season.
Buyer: Project manager or equipment managerWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Timber Lane Utility District: lift station rehabilitation Houston, TX · Storm water lift stations 2 and 713
A lift station under rehabilitation has to keep moving water while it is open, which is temporary bypass pumping.
Buyer: Awarded contractor's superintendentWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Northwest Harris County MUD No. 10 Houston, TX · Wastewater plant expansion to 1.3 MGD14
A treatment plant expansion needs bypass pumping to keep the plant running while tie-ins happen.
Buyer: Awarded contractor's project managerWhy it’s ranked here
A strong fit.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Hensel Phelps San Antonio, TX · Construction manager at risk15
The company that coordinates the whole terminal job picks vendors for the site, so one account covers every trade on it.
Buyer: Project executive or site logistics leadWhy it’s ranked here
In the middle.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- City of Kyle: wastewater plant expansion Kyle, TX · $200 million-plus wastewater investment16
An early works package means contractors are in the ground on I-35 south of Austin before the design is final.
Buyer: Public works or utilities directorWhy it’s ranked here
In the middle.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- City of San Antonio: Covel Road San Antonio, TX · Roadway and drainage, culverts17
A culvert and drainage job opening this winter is a few weeks from needing pumps, so the contractor choice is being made now.
Buyer: City project managerWhy it’s ranked here
In the middle.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Marigold Meadows pump and lift station Houston, TX · Stormwater pump station and wastewater lift station18
A new pump station and lift station in the ground means dewatering for the excavation first.
Buyer: Awarded contractor's superintendentWhy it’s ranked here
In the middle.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Austin Water: Walnut Creek wastewater plant Austin, TX · Capacity from 75 to 100 million gallons a day19
The largest 2026 capital project at the city utility is the kind of plant where bypass pumping runs for months, but a utility this size likely has a long-term vendor.
Buyer: Plant operations or capital projects leadWhy it’s ranked here
In the middle.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- City of San Antonio: Wilcox Avenue Area Drainage San Antonio, TX · $15.4 million drainage bond allocation20
A storm drain with a $15.4 million allocation starts in 2027, so this is a relationship to start before the bid.
Buyer: City project managerWhy it’s ranked here
An edge case, on purpose. It’s here to test a rule: Tests whether a job a year out is worth a first-week call.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Western Midstream Reeves County, TX · Second joint-industry produced-water facility21
Oil and gas water transfer is on your markets list, but Reeves County is a long way from San Antonio.
Buyer: Operations or field services leadWhy it’s ranked here
An edge case, on purpose. It’s here to test a rule: Tests oil and gas water work outside the branch's reach.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Select Water Solutions and LibertyStream Howard County, TX · 1,000 tonne-per-year lithium carbonate plant22
A plant being commissioned this December moves chemical and water through temporary lines first, but it sits in West Texas, outside the San Antonio branch.
Buyer: Operations leadWhy it’s ranked here
An edge case, on purpose. It’s here to test a rule: Tests a chemical-transfer buyer in West Texas.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Anheuser-Busch Houston, TX · $17 million upgrade23
A brewery that keeps investing moves a lot of water and wash fluid, but the announcement is from June 2025, so it tests how old a signal can be.
Buyer: Brewery engineering or maintenance leadWhy it’s ranked here
An edge case, on purpose. It’s here to test a rule: Tests a signal older than nine months.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- America First Refining Brownsville, TX · 168,000-barrel-per-day refinery24
A refinery at the engineering stage is years from needing pumps, and Brownsville is far south of the San Antonio branch.
Buyer: Project controls or construction leadWhy it’s ranked here
An edge case, on purpose. It’s here to test a rule: Tests a project at the engineering stage, far from the branch.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
- Fluor Texas · Front-end engineering and design25
A global contractor decides on site services only after the final investment decision, which this page says is a later step.
Buyer: Construction procurement leadWhy it’s ranked here
An edge case, on purpose. It’s here to test a rule: Tests a global contractor whose decision sits with a corporate procurement team.
- A buyer in the markets your site names: construction, municipal water, oil and gas, food and beverage or manufacturing.
- Within reach of the San Antonio branch: San Antonio and the I-35 corridor first, Houston next.
- Something changed in the last nine months: a project, a bid, a contract or a new plant.
- Needs dewatering, bypass or fluid transfer for a temporary stretch, which a rental covers.
- Not already a Capital Pump customer. Your site names no customers, so a name is dropped if you tell us it rents from you.
- Looks like the work your site describes: lift stations, treatment plants, job sites and plants.
Your new rep’s first 100 accounts, in 10 days
The first 25 are above, and they’re yours either way.
We build a handful of these a month, for founders hiring now.
10 days
from kickoff to your team running it
- 100 accounts you approve, each with the reason
- A first note to the top five, in your voice
- Your team runs it without us
- Any account you cut, we replace
How does Capital Pump & Equipment sell?
An outside read from your posting and your site, built to be corrected: tell us anything that’s wrong. Tap a clip to play it from that moment.
- CPCapital Pump & Equipment posting
“We support critical industries with innovative equipment, responsive service, and deep technical expertise.”
Capital Pump & Equipment posting · Inside Sales Representative - Pump Rentals posting - Ccpepumps.com/markets
“Job site dewatering”
cpepumps.com/markets · cpepumps.com/markets - Ccpepumps.com/markets
“Wastewater lift stations and treatment plants”
cpepumps.com/markets · cpepumps.com/markets - Ccpepumps.com/about
“CPE also has a full rental fleet of pumps to keep customers up and running in emergency situations or for those temporary applications.”
cpepumps.com/about · cpepumps.com/about - Ccpepumps.com
“CPE will keep you up and running with our team of dedicated experts in the pump industry, 24/7 whatever it takes.”
cpepumps.com · cpepumps.com - Ccpepumps.com/about
“With a dedicated staff of pump professionals helping select and size the correct pump from the beginning, projects are completed accurately the first time.”
cpepumps.com/about · cpepumps.com/about - CPCapital Pump & Equipment posting
“Generate leads and refer opportunities to the Outside Sales team.”
Capital Pump & Equipment posting · Inside Sales Representative - Pump Rentals posting - CPCapital Pump & Equipment posting
“Assist customers in selecting appropriate rental equipment, prepare rental agreements, and process sales orders.”
Capital Pump & Equipment posting · Inside Sales Representative - Pump Rentals posting
Words you use
- “Sewer bypass”
- “24/7 whatever it takes”
- “Floodwater drainage”
How the list learns your calls
In the first session you react to accounts like these: keep or cut, and why, the way you’d tell a cofounder. Each reason becomes a rule you can read, the pool re-scores, and ten more show whether it learned. Keep eight of ten and the hundred is built on your rules.
- You cut one on the call, and say why
- It becomes a rule
- The pool re-scores
- Ten more test it
Which questions can only you answer?
Your site names the markets you serve but not which jobs you would walk past, or what a contractor has to say before it is worth your Outside Sales team’s time. About 30 minutes of you reacting to real accounts answers these.
- 1
Which kind of job rents fastest for your team: sewer bypass, trench dewatering or emergency response?
Rows 3 and 1 are a sewer main and a creek-side utility job.
- 2
Does the rep follow Houston jobs from San Antonio, or only the branch’s own territory?
Rows 10 and 13 are Houston.
- 3
Do you call a general contractor that coordinates a whole job, or the trade contractor doing the digging?
Row 15 (Hensel Phelps) and row 4 (Zachry) are one airport job at two levels.
- 4
Would you call a job that is a year out?
Row 20 and row 24 are not starting soon.
What does your Inside Sales Representative - Pump Rentals’s first morning look like?
Without
The CRM you have now. The early weeks go to learning which accounts you’d call, and why.
With · Inside Sales Representative - Pump Rentals, first morning
- SBSouth Brazos Street utility workDraft written
- COCity of San Antonio: Peggy Drive Area DrainageDraft written
- SWSAWS: Wild Springs sewer main replacementDraft written
- ZCZachry ConstructionDraft written
- TMToyota Motor Manufacturing TexasDraft written
A hundred accounts you approved, the rules behind them and drafts to the first five, so their time goes to buyers.
From week two, your mornings too: one brief, drafts to approve, every message sent by you.
How the 10 days run
What happens in the ten working days?
November 16, 2026 to December 1, 2026. About a day of your time in total.
- Before by November 16
You send the customers you’d clone and three deals that went wrong, plus 10 to 20 emails or posts you wrote. “How you sell” is drafted from your talks and posts.
You: 20 minutes - Day 1 November 16
The playbook session: we fill the gaps and correct the draft together. Your CRM is connected.
You: 2 hours - Day 2 November 17
Your first rules are written; a few hundred companies are scored against them.
You: none - Day 3 November 18
You review the first 25 (talking it through is fine).
You: 30 minutes - Day 4 November 19
Your reasons become rules; you see the re-score and judge 10 more. First touches are written in your voice to the accounts you kept, and you read ten. Touches start logging to the CRM.
You: 30 minutes - Day 5 November 20
The hundred is built. The research tool is set up; you test it on three accounts you know.
You: 15 minutes - Day 6 November 23
The morning run is set up; your first morning, with us.
You: 30 minutes - Day 7 November 24
You review all hundred, and any cut is replaced. Team training, session one.
You: 1 hour 20 minutes - Day 8 November 25
Your first morning on your own. Training session two, hands-on for each person.
You: 1 hour plus your morning - Day 9 November 30
Your second morning on your own. Each person on your team runs the morning alone.
You: your morning - Day 10 December 1
Your third morning on your own. A week of touches is in the CRM. Handover sign-off.
You: 30 minutes plus your morning
Who builds it?
The person in the video does the work with you, from the first session to the handover.
-
“Kash and I built ERT Credit together in 2021. He took my MVP and turned it into a SaaS that hit $10M ARR in twelve months.”
Jordan Anderson, CEO, PayStreetgobridgehead.ai/about -
“Analytical in approach, technologically-knowledgeable, and earnest in conviction, Kash was able to drive pipeline in a notoriously challenging tech region.”
JBJason Brandt, Managing Director, Sales, ePlus inc.LinkedIn recommendation, April 2020
Where does this go from here?
Three options. Each one is fine.
Not a fit
Say so in a line, and that’s the end of it.
Not now
Keep the 25 and the read on how you sell, and share them. When the role fills, the offer stands.
Talk with Kash
Ask Kash to call you, or email him. He calls to set up a 30-minute strategy session. Bring your cofounder or your sales leader.
Your new rep’s first 100 accounts, in 10 days
The first 25 are above, and they’re yours either way.
We build a handful of these a month, for founders hiring now.
10 days
from kickoff to your team running it
- 100 accounts you approve, each with the reason
- A first note to the top five, in your voice
- Your team runs it without us
- Any account you cut, we replace
Capital Pump & Equipment sales playbook, in brief
Capital Pump & Equipment rents, sells and services industrial pumps for dewatering, sewer bypass, water transfer and emergency response, and its site says it keeps customers “up and running in emergency situations or for those temporary applications.”cpepumps.com/about, cpepumps.com/rentals
The Inside Sales Representative role in San Antonio is to help customers choose rental equipment, prepare rental agreements, dispatch deliveries and “generate leads and refer opportunities to the Outside Sales team.”Inside Sales Representative - Pump Rentals posting
The first 25 accounts for a new rep are San Antonio, Houston and Central Texas contractors, utilities and plants with a dated project or bid in 2026, each with a saved source.
Each is scored on six rules: fourteen strong fits, five in the middle and six edge cases that test the rules.
Questions founders ask
Can’t my SDR build this when they start?
They can. But wouldn’t you rather they were booking meetings? Reps spend 28% of their time selling, and the average SDR takes 3.0 months to ramp and stays 1.9 years. This replaces the weeks they would spend building the list and learning what you already know.
28%: Salesforce, State of Sales (7,700+ sellers, 2022) · 3.0 months: Bridge Group, 2025 SDR report (351 companies)
How much sooner does my new SDR get to work?
From day one, because the accounts you approved and the first drafts are waiting. The average SDR takes 3.0 months to ramp, and only 60% hit quota.
3.0 months: Bridge Group, 2025 SDR report (351 companies) · 60%: Bridge Group, 2025 SDR report (351 companies)
We tried an outreach tool and it sounded like a robot. How is this different?
Nothing goes out on its own. Every account on the list is one you approved, every draft is written to one person, and you send each message yourself. It learns your voice from what you’ve written and from every edit you make.
How much of my time does it take?
About a day, spread across the ten working days: the 2-hour session on how you sell, short list reviews you can talk through, two training sessions and your first mornings. The hours your SDR gets back go to selling, where reps spend just 28% of their time today.
What happens after you leave?
It keeps learning. Each week it proposes rule changes from what your cuts, replies and silences showed, and you approve or reject each in a line.
Where does my data live?
In your own accounts: your Claude, your CRM, your files. Nothing runs on anyone else’s side, and any rule can be changed in plain English.
How is it priced?
The first engagement is one fixed price for the ten days. It depends on how many people we train and which systems we connect, so Kash quotes it on a short call. After handover, you can keep us on a retainer to keep supporting your sales process and refining it, if you choose that route.
The research behind this page 4 sources · 1 postings · 0 customers · 80 stores looked at
Your talks and posts
Your open roles
Your customers
(santehq.com/customers and your posts). Customer photos are from santehq.com/customers.
How the 25 were picked
80 stores found and scored on 6 rules; the 25 chosen to teach: 14 strong, 5 middle, 6 at the edges. Logos are from each store’s own site.
- Sources: owner announcements, trade press and public bid pages for each project, each opened and saved on November 9, 2026.
- Your website’s leadership notice dates from 2024, so how Capital Pump sells comes from the posting and the site pages saved here.
- The Inside Sales posting is for San Antonio. The Houston rows test whether the rep follows jobs there.
- Where a project page names no contractor yet, the buyer is the awarded contractor, and the title is a role, not a named person.
- The Wilcox Avenue and Covel Road rows come from the city’s own construction estimates, not an award.